True / False
1. An exercise is a component of labor that has an anticipated length, price, and useful resource necessities.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: An exercise or process is a component of labor usually discovered on the work breakdown construction (WBS) that has anticipated length, price, and useful resource necessities.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.244
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.39 – LO: 6-1
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
The Significance of Project Schedules
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
2. In venture schedule administration, the first output of defining actions is a schedule administration plan.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: In venture schedule administration, the principle output of defining actions are an exercise record, exercise attributes, a milestone record, and venture administration plan updates.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.245
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.39 – LO: 6-1
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
The Significance of Project Schedules
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
3. In venture schedule administration, the subsequent step after sequencing actions is to outline these actions.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: Estimating exercise durations entails estimating what number of assets— folks, gear, and supplies—a venture group ought to use to carry out venture actions. In venture time administration, this course of follows after sequencing actions.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.245
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.39 – LO: 6-1
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
The Significance of Project Schedules
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
4. Project schedules develop out of primary paperwork such because the venture constitution.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: Project schedules develop out of the fundamental paperwork that provoke a venture. The venture constitution typically mentions deliberate venture begin and finish dates, which function the beginning factors for a extra detailed schedule.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.244
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.40 – LO: 6-2
NATIONAL STANDARDS:
United States – BUSPROG: o Reflective Considering – BUSPROG: Analytic expertise: Statistics and Management Science
TOPICS:
Planning Schedule Management
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
5. A schedule administration plan contains info which describes the format and frequency of schedule studies required for the venture.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: A schedule administration plan contains info on reporting codecs. This info describes the format and frequency of schedule studies required for the venture. As well as, it additionally contains info on course of descriptions and describes how the entire schedule administration processes will likely be carried out.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.246
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.40 – LO: 6-2
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Planning Schedule Management
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
6. To outline actions, the venture group ought to begin with reviewing the schedule administration plan, scope baseline, enterprise environmental elements, and organizational processes.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: Defining actions entails figuring out the particular actions that can produce the venture deliverables in sufficient element to find out useful resource and schedule estimates. The venture group evaluations the schedule administration plan, scope baseline, enterprise environmental elements, and organizational course of belongings to start defining actions.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.246
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.41 – LO: 6-3
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Defining Actions
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
7. It is necessary for the exercise record and exercise attributes to lend a hand with the work breakdown construction.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: The exercise record and exercise attributes ought to lend a hand with the work breakdown construction. Information is added to the exercise attributes because it turns into out there; this info contains logical relationships and useful resource necessities which might be decided in later processes.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.246
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.41 – LO: 6-3
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Defining Actions
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
8. Milestones are straightforward to realize and are at all times achieved by one predominant exercise.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: A milestone on a venture is a big occasion that usually has no length. It typically takes a number of actions and a variety of work to finish a milestone, however the milestone itself is sort of a marker to assist in figuring out vital actions.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.246
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.41 – LO: 6-3
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Defining Actions
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
9. After defining venture actions, the subsequent step in venture schedule administration is creating the schedule.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: After defining venture actions, the subsequent step in venture time administration is sequencing them or figuring out their dependencies.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.248
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
10. A dependency pertains to the sequencing of venture actions or duties.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: A dependency or relationship pertains to the sequencing of venture actions or duties. Figuring out these relationships or dependencies amongst actions has a big impression on creating and managing a venture schedule.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.248-249
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: o Reflective Considering – BUSPROG: Analytic expertise: Statistics and Management Science
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
11. Community diagrams are the popular approach for exhibiting exercise sequencing.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: Community diagrams are the popular approach for exhibiting exercise sequencing. A community diagram is a schematic show of the logical relationships amongst venture actions and their sequencing.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.249
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
12. The arrows in a community diagram symbolize missed milestones in a venture.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: A community diagram is a schematic show of the logical relationships amongst venture actions and their sequencing. The arrows in a community diagram symbolize the exercise sequencing or relationships between duties.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.249
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: – Comprehension
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
13. In a community diagram, it’s necessary for each merchandise on the WBS to be proven as an alternative of solely these actions with dependencies.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: The community diagram represents actions that should be completed to finish the venture. Not each merchandise on the WBS must be proven on the community diagram; solely actions with dependencies have to be proven.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.249-250
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: – Comprehension
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
14. A merge happens when one node precedes a number of nodes.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: A merge happens when two or extra nodes precede a single node. Then again, bursts happen when two or extra actions observe a single node.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.250
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
7/25/2018 5:23 PM
15. Begin-to-finish relationships are probably the most continuously used dependencies between actions.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: One of many 4 kinds of dependencies or relationships between actions is the start-to-finish dependency. It is a relationship through which the “from” exercise should begin earlier than the “to” exercise may be completed. One of these relationship is never used, however it’s acceptable in some circumstances.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.252
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
16. A disadvantage of the priority diagramming methodology is that it can’t be used until dummy actions are employed.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: The priority diagramming methodology affords a number of benefits over the AOA approach. One benefit is that utilizing this methodology avoids the necessity to use dummy actions.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.252
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.42 – LO: 6-4
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Sequencing Actions
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
17. In a Gantt chart, thick black bars symbolize milestones achieved in a venture.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: Gantt charts present an ordinary format for displaying venture schedule info by itemizing venture actions and their corresponding begin and end dates in calendar type. In a Gantt chart, a black diamond image represents a milestone.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.255
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
18. A Monitoring Gantt chart relies on the proportion of labor accomplished for venture duties or the precise begin and end dates.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: A Monitoring Gantt chart relies on the proportion of labor accomplished for venture duties or the precise begin and end dates. It permits the venture supervisor to observe schedule progress on particular person duties and the entire venture.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.258
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
19. An obstacle of utilizing Gantt charts is that they don’t present an ordinary format for displaying deliberate venture schedule info.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: The principle benefit of utilizing Gantt charts is that they supply an ordinary format for displaying deliberate and precise venture schedule info.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.259
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
20. In a essential path evaluation, the shortest path is what drives the completion date for the venture.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: In a essential path evaluation, a number of duties are completed in parallel on initiatives, and most initiatives have a number of paths by a community diagram. The longest path or the trail that comprises the essential duties is what drives the completion date for the venture.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.259
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
21. The essential path on a venture can change because the venture progresses.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: The essential path represents the shortest time required to finish a venture. The essential path on a venture can change because the venture progresses.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.261
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
22. A backward go by the community diagram determines the early begin and early end dates for every exercise.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: A backward go by the community diagram determines the late begin and late end dates for every exercise. In distinction, a ahead go determines the early begin and early end dates for every exercise.
POINTS:
1
DIFFICULTY:
Issue: Straightforward
REFERENCES:
p.262
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Data
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
23. Realizing the quantity of float permits venture managers to know whether or not a venture schedule is versatile.
a.
True
b.
False
ANSWER:
True
RATIONALE:
Suggestions: Realizing the quantity of float or slack permits venture managers to know whether or not the schedule is versatile and the way versatile it may be. A quick and straightforward solution to decide early and late begin and end dates and free and whole slack quantities for actions is by utilizing venture administration software program.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.263
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 PM
24. The principle drawback of crashing is that it lengthens the time wanted to complete a venture.
a.
True
b.
False
ANSWER:
False
RATIONALE:
Suggestions: The principle benefit of crashing is that it shortens the time wanted to complete a venture. The principle drawback is that it typically will increase whole venture prices.
POINTS:
1
DIFFICULTY:
Issue: Reasonable
REFERENCES:
p.264
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES:
INFO.SCHW.14.44 – LO: 6-7
NATIONAL STANDARDS:
United States – BUSPROG: Analytic
TOPICS:
Growing the Schedule
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:50 PM
DATE MODIFIED:
6/6/2018 6:06 P
Anatomy Physiology Associated Check Banks
Test Bank For Intimate Relationships Marriages And Families 9th Edition by Nancy Stinnett
User Reviews
Be the first to review “Information Technology Project Management 9th edition Kathy Schwalbe”
Original price was: $35.00.$24.97Current price is: $24.97.
There are no reviews yet.